Pre-shipment inspection

We check the finished unit against your order — specification, condition, weight and quantity — and send you the evidence before the balance is due.

Book an inspection
IncludedPart of our sourcing fee on every order, any size
You receivePhoto set, weight ticket and a written variance note
TimingBefore the balance is due, never after loading
AttendanceYou are welcome to attend in personArrange a visit
How it runs

6 steps, in this order

The order matters as much as the checks. An inspection done after loading is a record, not a safeguard.

  1. We book the inspection when the unit is finished

    Not while it is still in the paint booth. An inspection run too early is a photograph of intent rather than a record of what will ship.

  2. We check the specification line by line

    Dimensions, axle and brake brand and rating, steel grade and plate thickness, suspension type, tyre size and count, fittings, spares and paint system — against the order document, not against the supplier's description.

  3. We record the physical condition

    Weld quality on the main beam and cross-members, frame straightness, corrosion, and on used equipment the engine hours, chassis number, brake and tyre wear and any accident repair.

  4. We weigh the unit

    Tare weight on a certified weighbridge, photographed with the ticket. A unit lighter than specification means thinner steel, and this is the check that finds it.

  5. We verify quantity and loading

    Unit count against the order, then the securing itself — lashing points, chains and blocking photographed before the vessel accepts the cargo.

  6. We send you the report before the balance is due

    Photo set, weight ticket and a written note of anything that differs from the order. If something is wrong you hear it from us, not from your driver at the port.

Reply within 24 hours

Ask about pre-shipment inspection

Tell us the unit and the supplier, and we will explain exactly what we would check.

Fastest way to reach you

Or message us directly on WhatsApp: +86 175 5718 7040

What we cover

6 areas on every inspection

More is added per model — crane mounts on a sidelifter, compartment testing on a tanker, hydraulics on used plant.

Specification match

Specification match

Every line of the order document verified against the physical unit.

Weld and frame quality

Weld and frame quality

Main beam, cross-members, hinge and crane mounts where applicable.

Axles, brakes, tyres

Axles, brakes, tyres

Brand, rating, matched sets and remaining tread on used units.

Tare weight

Tare weight

Certified weighbridge ticket, photographed with the unit visible.

Paint and corrosion protection

Paint and corrosion protection

Preparation and coat thickness, heavier system for coastal destinations.

Loading and securing

Loading and securing

Lashing, chains and blocking photographed before the vessel accepts it.

Limits

What this service is not

Stating the limits is part of the service. A report that claims more than it covers is worse than no report.

  • We are not a third-party certification body. Where you need SGS, BV or CIQ certification we arrange it and pass through the cost — our own report is not a substitute for it.
  • We do not test to destruction, load-test to rated capacity, or issue engineering approvals. Those belong to the factory and its certifier.
  • For used equipment we report what is visible and measurable. We do not open engines or gearboxes unless you ask and pay for it.
Related services
All nine services
FAQ

Inspection questions

No. Pre-shipment inspection is part of what our sourcing fee covers, on every order regardless of size. Third-party certification is extra and quoted at cost.

Sourcing from a supplier you have not met?

We will inspect it before you pay the balance

Get a quoteWhatsApp us